Monday, February 8, 2010

BZA Results- February 8, 2010


V-10-09 Daniel & Pamela Sholl - APPROVED with conditions (4-1)
Rear-yard setback of two (2) feet rather than the five (5) feet required for an accessory building.
Conditions: Firewall should be installed per Building Department requirements.
Notes: Post-construction

V-10-10 Sandra Palmersheim - APPROVED (5-0)
Lakefront setback of thrity-one (31) feet rather than the thirty (33) feet required.
Conditions: No enclosure beyond the lakefront traverse line.
Notes: Original survey was not accurate, resulting in incorrect dimensions.

V-10-11 Keith & Louise Pomeroy - TABLED (5-0)
Side-yard setback of two (2) feet eight (8) inches rather than the five (5) feet required for an accessory building
Conditions: None.
Notes: Several discrepancies with the property line location need to be clarified.

V-10-12A Steve Smith & James & Judith Boissenet - APPROVED with conditions (5-0)
Pottery studio in a Lake Residential Zoning District where that use is neither a permitted nor a special exception use.
Conditions: Variance is for Steve Smith and Doug Fiely; it does not run with the property.
Notes: None.
V-10-12B Steve Smith & James & Judith Boissenet - APPROVED with conditions (5-0)
Two (2) uses on a lot rather than the one (1) use permitted.
Conditions:
Variance is for Steve Smith and Doug Fiely; it does not run with the property.
Notes: Uses are commercial (pottery studio) and residential (apartment).
V-10-12C Steve Smith & James & Judith Boissenet - APPROVED (5-0)
Commercial driveway spacing of fifty (50) feet rather than the three hundred (300) feet required.
Conditions: None.
Notes: Spacing is measured from centerline to centerline. Spacing varies by the posted speed limit; here, the speed limit is 40mph.

V-13A David Spyker - DENIED (0-5)
Road-front setback of six (6) inches rather than the twenty-five (25) feet required for an accessory building.
Conditions: None.
Notes: Post-construction variance.
V-13B David Spyker - DENIED (0-5)
Rear-yard setback of four (4) inches rather than the five (5) feet required for an accessory building.
Conditions: None.
Notes: Post-construction variance.

V-10-14A Stacy Elling - APPROVED as presented (5-0)
Road-front setback of ten (10) feet rather than the twenty-five (25) feet required.
Conditions: As presented.
Notes: Setback is measured from a private roadway to the north of the property.
V-10-14B Stacy Elling - APPROVED (5-0)
Sideyard setback of six (6) inches rather than the five (5) feet required.
Conditions: None.
Notes: None.